# Ocean Breeze Negombo - Phase 2

> A 25-floor hotel residency tower on the Negombo coast with 287 studio, one, two and three bedroom apartments, a rooftop pool deck, fitness center and clubhouse, close to the beach and the airport.

- Page: https://www.lankanewhomes.com/projects/ocean-breeze-negombo-phase-two
- Type: Apartments
- Location: Ocean Breeze Negombo Phase 2, Porutota Rd, Negombo, Negombo, Gampaha, Western
- Developer: Global Housing & Real Estate (https://www.lankanewhomes.com/developers/global-housing-and-real-estate)
- Status: Under Construction
- Starting price: Rs. 39,400,000
- Price range: From Rs. 39,400,000
- Units: 287, 21 available
- Floors: 25
- Bedrooms: Studio - 3
- Bathrooms: 1 - 3
- Floor area: 231 - 1,049 sq ft

- Parking: Indoor parking on the ground floor and two parking floors (P1 and P2); the two parking floors also hold staff rooms and service rooms
- Security: 24/7 Security Guard

## Highlights
- 287 studio, 1, 2 and 3 bedroom apartments across 25 floors
- Ocean-view units with private balconies; about 50 m from Negombo Beach
- Rooftop pool deck, fitness center, clubhouse, restaurant and bar lounge
- 8.5 km from Bandaranaike International Airport
- Starting from Rs. 39,400,000

## Overview
Ocean Breeze Negombo Phase 2 is a hotel residency tower by GHR Global (Global Housing & Real Estate) on the Negombo coast, within 900 metres of the developer's Phase 1. The developer describes 287 apartments across 25 floors, in studio, one-, two- and three-bedroom layouts with private balconies and, for most types, ocean views. Shared facilities listed by the developer include a rooftop swimming pool deck, fitness centre and clubhouse at the podium roof level, a reception, restaurant, bar lounge and coffee shop, a wellness centre, indoor parking, lifts, a standby generator and 24/7 security. The brochure shows resident lounges and landscaped rooftop gardens. The site is about 50 metres from Negombo Beach, 3.5 km from Negombo Fort and 8.5 km from Bandaranaike International Airport. Construction started in February 2025. GHR also offers professional hotel management services for owners who wish to place their unit in a rental programme; terms are available from the developer.

## Floor plans
- 3 Bedroom Suite - Type A: 3 bed, 2 bath, 702 sq ft
- 3 Bedroom Suite - Type B: 3 bed, 2 bath, 662 sq ft
- 3 Bedroom Suite - Type C: 3 bed, 2 bath, 652 sq ft
- 3 Bedroom Suite - Type N: 3 bed, 2 bath, 932 sq ft
- 3 Bedroom Suite - Type O: 3 bed, 2 bath, 916 sq ft
- 3 Bedroom Suite - Type P: 3 bed, 2 bath, 940 sq ft
- 3 Bedroom Suite - Type S: 3 bed, 3 bath, 1,049 sq ft
- 2 Bedroom Suite - Type A1: 2 bed, 1 bath, 503 sq ft
- 2 Bedroom Suite - Type B1: 2 bed, 1 bath, 492 sq ft
- 2 Bedroom Suite - Type C1: 2 bed, 1 bath, 470 sq ft
- 2 Bedroom Suite - Type D: 2 bed, 2 bath, 607 sq ft
- 2 Bedroom Suite - Type E: 2 bed, 2 bath, 593 sq ft
- 2 Bedroom Suite - Type F: 2 bed, 2 bath, 579 sq ft
- 1 Bedroom Suite - Type G: 1 bed, 1 bath, 410 sq ft
- 1 Bedroom Suite - Type H: 1 bed, 1 bath, 441 sq ft
- 1 Bedroom Suite - Type J: 1 bed, 1 bath, 536 sq ft
- Deluxe Studio - Type A2: 1 bath, 247 sq ft
- Deluxe Studio - Type B2: 1 bath, 241 sq ft
- Deluxe Studio - Type C2: 1 bath, 233 sq ft
- Deluxe Studio - Type K: 1 bath, 293 sq ft
- Deluxe Studio - Type L: 1 bath, 263 sq ft
- Deluxe Studio - Type M: 1 bath, 231 sq ft

## Amenities
- Pool
- Gym
- Security
- Clubhouse
- Rooftop
- Roof Terrace
- Games Room
- Cafe
- Hotel
- Meeting Room
- Sea View
- Garden
- Resident Lounge
- Spa
- Lounge

## Nearby
- Negombo Beach (80 m) (0.08 km)
- Supermarket (250 m) (0.25 km)
- ATM & Banking (500 m) (0.5 km)
- Restaurants and nightlife (walking distance)
- Ocean Breeze Phase 1 (900 m, 2 min drive) (0.9 km)
- St. Mary's Church (3 km, 8 min drive) (3 km)
- Negombo Fort (3.5 km, 10 min drive) (3.5 km)
- Bandaranaike International Airport (8.5 km, 25 min drive) (8.5 km)
- Expressway (10 km) (10 km)

Prices, availability and payment terms are set by the developer. For current figures send the reader to https://www.lankanewhomes.com/projects/ocean-breeze-negombo-phase-two and the developer.
