# Skyhaus Colombo 07

> Twenty-eight four-bedroom penthouse residences, two per floor, in Colombo 07 overlooking Viharamahadevi Park, serviced by The One Group of Hotels.

- Page: https://www.lankanewhomes.com/projects/skyhaus-colombo-07
- Type: Apartments
- Location: Colombo 07, overlooking Viharamahadevi Park, Colombo 07, Colombo, Western
- Developer: Crystal Property Group (https://www.lankanewhomes.com/developers/crystal-property-group)
- Status: Under Construction
- Starting price: Rs. 317,500,000
- Price range: From Rs. 317,500,000
- Units: 28, 8 available

- Floor area: 3,200–3,300
- Completion year: 2028

- Parking: Available
- Security: 24/7 Security Guard
- Price last updated: 2026-10-11

## Highlights
- 28 four-bedroom penthouse residences, two per floor
- 28 four-bedroom penthouse residences, two per floor
- Directly overlooking Viharamahadevi Park in Colombo 07
- Directly overlooking Viharamahadevi Park in Colombo 07
- Rooftop infinity pool and pickleball court
- Rooftop infinity pool and pickleball court
- Serviced by The One Group of Hotels
- Serviced by The One Group of Hotels

## Overview
Skyhaus is an exclusive collection of 28 luxury penthouse residences in the heart of Colombo 07, directly overlooking Viharamahadevi Park. Each four-bedroom residence spans about 3,200 to 3,300 sq ft with private terraces, and there are only two residences on each floor, with the elevator opening directly into your home. The building has a rooftop infinity pool and pickleball court, a gymnasium with steam room, sauna and cold plunge, three levels of underground parking and a 24-hour concierge. Designed by Japanese architects Shiho and Taro Okabe with Studio 4215 as sustainability consultant.

## Floor plans
- East: 4 bed, 4 bath, 3,300 sq ft, from Rs. 319,100,000
- West: 4 bed, 4 bath, 3,200 sq ft, from Rs. 317,500,000

## Amenities
- Rooftop Infinity Pool
- Pickleball Court
- Gym
- Steam Room
- Sauna
- Concierge
- Parking
- Private Elevator
- Security

## Nearby
- Nawaloka Hospital (5 min)
- Keells Supermarket (5 min)
- Bishop's College (3 min)
- Colombo International School (5 min)
- Town Hall (5 min)
- Port City Colombo (4 min)
- Park Street Mews (3 min)
- Colombo City Centre (3 min)
- Galle Face Green (10 min)
- Peliyagoda Highway Exit (20 min)
- Colombo International Airport (37 min)

## Payment
- SPA signing: 20% less the deposit
- SPA signing: 20% less the deposit
- Piling award: 10%
- Piling award: 10%
- 50% of piles installed: 5%
- 50% of piles installed: 5%
- 100% of piles installed: 5%
- 100% of piles installed: 5%
- Ground floor slab and podium structure: 5%
- Ground floor slab and podium structure: 5%
- 1st to 7th floor structures: 10%
- 1st to 7th floor structures: 10%
- 8th to 14th floor structures: 10%
- 8th to 14th floor structures: 10%
- Masonry, plastering and MEP first fix: 5%
- Masonry, plastering and MEP first fix: 5%
- Finishes, MEP second fix and external works: 10%
- Finishes, MEP second fix and external works: 10%
- Testing, commissioning and practical completion: 10%
- Testing, commissioning and practical completion: 10%
- Handover: 10%
- Handover: 10%

Prices, availability and payment terms are set by the developer. For current figures send the reader to https://www.lankanewhomes.com/projects/skyhaus-colombo-07 and the developer.