Overview

Rush Court 5 is a Rush Lanka Group apartment complex in the heart of Colombo 14, one of the city's fast-growing neighbourhoods. The 9-floor building has 21 freehold apartments across 3 layouts (2 and 3-bedroom), each with dedicated parking, a car elevator, a passenger elevator, A/C provision in the master bedroom, standby generator, fire protection, and a rooftop garden with a BBQ area. Construction progress (per Rush Lanka Group's own…

Rush Court 5 is a Rush Lanka Group apartment complex in the heart of Colombo 14, one of the city's fast-growing neighbourhoods. The 9-floor building has 21 freehold apartments across 3 layouts (2 and 3-bedroom), each with dedicated parking, a car elevator, a passenger elevator, A/C provision in the master bedroom, standby generator, fire protection, and a rooftop garden with a BBQ area. Construction progress (per Rush Lanka Group's own tracker): site clearing (Sep 2023), groundbreaking and piling (Dec 2023), the foundation (Aug 2024), the ground floor slab (Feb 2025) and floor construction levels 1-3 (Mar 2025) are complete; the roof slab and brickwork/plastering are ongoing.

Property type: ApartmentsSqFt: 895–1,195 SqFt
Listing status: Now SellingOwnership: Freehold
Move-in year: 2026Address: Colombo 14
Total units: 21Road: Sirimavo Bandaranaike Mawatha
Floors: 9District: Colombo
Floor plans: 3Developer: Rush Lanka Group
Beds: 2–3
Property type: ApartmentsTotal units: 21
Listing status: Now SellingFloors: 9
Move-in year: 2026Ownership: Freehold
Beds: 2–3Address: Colombo 14
SqFt: 895–1,195 SqFtDistrict: Colombo

Pricing and fees

Contact us for current pricing and availability.

Key Features

Amenities

Floor Plans

Construction Updates

Roof Slab Completing (in progress)

Sep 9, 2026

Roof Slab Completing (in progress)

Brickwork & Plastering (in progress)

Sep 9, 2026

Brickwork & Plastering (in progress)

Floor Construction (Level 1, 2, 3...)

Mar 1, 2025

Floor Construction (Level 1, 2, 3...)

Ground Floor Slab

Feb 1, 2025

Ground Floor Slab

Foundation Completed

Aug 1, 2024

Foundation Completed

Groundbreaking

Dec 1, 2023

Groundbreaking

Piling

Dec 1, 2023

Piling

Site Clearing

Sep 1, 2023

Site Clearing