Overview
Rush Metropolis is a 23-storey luxury apartment tower at No. 05, Jayanthi Road, Dehiwala — described by the developer as the tallest and most ambitious residential project in the area. The tower has 125 apartments in 2 and 3-bedroom layouts across 7 unit types. Construction progress (per Rush Lanka Group's own tracker): site clearing (Apr 2024), groundbreaking (Jul 2024), piling (Aug 2024) and the foundation (Jun 2025) are complete; the…
Rush Metropolis is a 23-storey luxury apartment tower at No. 05, Jayanthi Road, Dehiwala — described by the developer as the tallest and most ambitious residential project in the area. The tower has 125 apartments in 2 and 3-bedroom layouts across 7 unit types. Construction progress (per Rush Lanka Group's own tracker): site clearing (Apr 2024), groundbreaking (Jul 2024), piling (Aug 2024) and the foundation (Jun 2025) are complete; the ground floor slab and floor construction (levels 1-3) are in progress. Unit types (per the developer's brochure): Unit A 3 bed / 1,312 sq ft, Unit B 2 bed / 988 sq ft, Unit C 2 bed / 998 sq ft, Unit D 3 bed / 1,430 sq ft, Unit E 3 bed / 1,581 sq ft, Unit F 2 bed / 932 sq ft, Unit G 3 bed / 1,484 sq ft. Floor-to-floor height 10.5 ft, three high-speed passenger elevators. Architect: Anushka Dassanayaka (AIA SL); structural engineer: Laksiri Cooray. Sales & marketing partner: Rush2Homes.
| Property type: Apartments | Beds: 2–3 |
| Listing status: Now Selling | SqFt: 930–1,580 SqFt |
| Move-in year: 2028 | Address: Dehiwala |
| Total units: 125 | Road: Jayanthi Road |
| Floors: 23 | District: Colombo |
| Floor plans: 7 | Developer: Rush Lanka Group |
| Property type: Apartments | Total units: 125 |
| Listing status: Now Selling | Floors: 23 |
| Move-in year: 2028 | Address: Dehiwala |
| Beds: 2–3 | District: Colombo |
| SqFt: 930–1,580 SqFt |
Pricing and fees
Contact us for current pricing and availability.
Key Features
Amenities
Floor Plans
AvailableUnit A
Contact for pricing
Apartments
AvailableUnit B
Contact for pricing
Apartments
AvailableUnit C
Contact for pricing
Apartments
AvailableUnit D
Contact for pricing
Apartments
AvailableUnit E
Contact for pricing
Apartments
AvailableUnit F
Contact for pricing
Apartments
Construction Updates

Sep 9, 2026
Ground Floor Slab (in progress)

Sep 9, 2026
Floor Construction (Level 1, 2, 3...) (in progress)

Jun 1, 2025
Foundation Completed

Aug 1, 2024
Piling

Jul 1, 2024
Groundbreaking

Apr 1, 2024
Site Clearing